Photographs Of A Hubbellite Installation

wpe19.jpg (5772 bytes)

 

wpeC.jpg (32884 bytes)

  

A Second Pass To Increase Density  -- wpe2B.jpg (87013 bytes)

Back To Home Page

Photo 1  --  Installing Cove Base Strips

Photo 2   --  Installing Cove Base Bonding Paste

Photo 3   --  Applying Bonding Paste To The Floor

Photo 4   --  Installing A 4" Cove Radius Base

Photo 5   --   Initial Hubbellite Application

Photo 6   --  Floating Hubbellite To Proper Thickness

Photo 7   --  Placing The Hubbellite Against The Base

Photo 8   --  Initial Pass To Establish Flatness

Photo 9   --  Joining The Floor And Base

Photo 10 -  The Second Pass On Pegged Kneeboards

Photo 11 -  The Third Pass On Sliding Kneeboards

Photo 12 -  Finishing Tightly Near A Drain

Photo 13 -  Applying Hubbellite Buffing Dressing

Photo 14 -  Dry Buffing The Hubbellite Floor

Photo 15 -  A Finished Hubbellite Floor